Powder Coating Water Treatment Equipment
   for Commercial and Industrial Applications
The Environmental Warehouse home page
see also our Water Quality Test Equipment for powdercoating applications
Download the Powder Coating Water Treatment Brochure
Deionised Water Systems
Part no. DP-2000

Description:
The DI system includes a water 
recirculation pump, sediment filter, 
carbon filter, two ion exchange resin
columns, valves & electrical controls. 
All items are mounted on a base frame.
UV disinfection is available as an option.

Applications:
Use on the final rinse tank prior to drying and powder coating. The system provides high quality water that complies with the Australian Standard and with the 
paint manufacturers standard for final rinse water quality for "guaranteed" work. 

The benefits are a completely salt free finish on the aluminium, therefore no corrosive salts are trapped between the metal surface and paint coat.

deionised water system
Rinse Tank Filters
Part no. MF-01 & MF-02

Description:
The tank filter system includes a filter, pump, valves & electrical panel. All items are supplied fully assembled on a mobile baseframe with a set of lockable wheels. Interconnection to the tanks is via "quick-release" 32 mm diameter Camlok fittings. Supplied fully assembled and ready to operate.

Applications:
The mobile filters are designed to reduce the build-up of suspended solids, sludge, dust and other particulate matter in the rinse tanks.  Systems are also available to filter the acid etch & chromate tanks.  One mobile filter can be used to filter all tanks.  The system is supplied with an extension lead so that it may be moved easily from tank to tank as required. 

The benefits are improved performance and extended life of the acid and chromate tanks, less carryover of solids & sludge to other tanks and a cleaner aluminium product.
Reduces rinse water usage & keeps your rinse tanks in top condition!

Need more information?  Email us for full description, supplied in pdf format.

Trade Wastewater Treatment Systems
Part no. TWP 2000
Price:  Call for a price specific to your site needs.
Delivery time: 8-12 weeks

Description:
Batch treatment of wastewater in a fibreglass tank with cone discharge at base.  Water is pH adjusted, chrome, aluminium, solids, fluoride are removed, water is clarified and sludge thickened.  Process duties from 500 - 3,000 L/h.  Larger systems also available.  System is supplied on a skid complete with tank, electrical panel & pumps.

Applications:
Suitable for corrosive & aggressive industrial wastewater applications such as powder coating & many other trade waste applications. 

Guaranteed Results:
Over 20 years of experience in the water industry enables us to guarantee our systems will produce wastewater that complies with current trade wastewater laws.



Sludge Filters
Part no. SF1-4 or CF-1
Price:  Call for a price specific to your site needs.
Delivery time: 2-6 weeks.

Description:
Systems available as either continuous flow  (1-4 bags in parallel) or batch treatment in a "Container Filter". Supplied on a skid  with filtrate tank, control panel and pumps.

Applications:
Suitable for most types of wastewater sludge including aluminium, iron, phosphate, chrome & heavy metals. 

Need more information?Email us for a full description or, download our Powder Coating Water Treatment Brochure


The Environmental Warehouse home page